OSHA 29 CFR 1910.95 (a) – It’s a Noise Exposure Standard, Not Just a Confusing Number

Strings of numbers and characters can often appear daunting.  For instance, if I wrote in binary code it would be a string of ones and zeros.  (01000101 01101110 01100111 01101001 01101110 01100101 01100101 01110010 01101001 01101110 01100111 00100000 01101001 01110011 00100000 01000001 01010111 01000101 01010011 01001111 01001101 01000101.) That can look like gibberish and cause concern if unknown or it can make sense to programmers and people familiar with binary code.

Other alphanumeric strings may cause some concern for industry professionals.  Take, for instance, OSHA standards. The OSHA standard 29 CFR 1910.95 (a) may be unfamiliar to some, and thus concerning. Many Environmental Health and Safety Engineers will recognize this code.  It is an OSHA standard that revolves around the amount of time an employee is permitted to be exposed to specific sound levels. These sound levels are all based on the weighted sound level of the noise the operators are exposed to. To better understand how the octave and frequency of the sound play into this, there is a chart provided below.

Equivalent A-Weighted Sound Level Chart – (1)

The weighted sound level is the level at which a Digital Sound Level Meter will read the current level of noise within an environment. This scale is then used to move further into the OSHA directive that we focus on helping companies meet to best provide safe environments for their employees to work in.

If you notice, the lowest weighted sound level is 90 dBA, this is also the lowest-rated noise level that OSHA speaks of in 1910.95(b)(2). It has been shown that noise levels over this level for extended periods will result in permanent hearing loss. The standard then goes on to discuss the duration an employee can be exposed to noise levels even with the use of personal protective equipment as well as even impulsive or impact noise.  The table of permissible time limits is shown below.

Permissible Noise Exposures (2)

As you can see from the table above provided by OSHA, any noise level that an operator is exposed to for eight hours cannot exceed 90 dBA. Noises within an industrial environment can also be variable throughout the day. For instance, the operator stands outside of a sheet metal press and the concussive strike on the press gives off a 90 dBA strike for every stroke of the press. This would not be a continuous noise level. Maybe the operator is operating a CNC machine that is cutting a nest of parts and uses a handheld blowgun to remove debris and coolant from the parts before taking them from their fixture. This blowgun is not used continuously and therefore would not be rated as such for the exposure time. A time study would be conducted on the average length of time the operator is utilizing this gun along with the level of noise it produces during use. OSHA then gives a calculation to use to appropriately combine the sound level while the gun is being used and when it is not in use. That equation is written out below.

Mixed Environment Exposure Fraction
C1/T1+C2/T2+… = ____
Total Exposure Fraction
Cn/Tn = ____

Where:
C1 = Duration of time for a specified noise level
T1 = Total time of exposure permitted at that level
Cn = Total time of exposure at a specified noise level
Tn = Total exposure time permitted at that level

Should the summation of the fractions for different exposures be greater than the Total Exposure fraction, the summation value should be used. As mentioned above, a time study on exposure to noise levels will be needed to obtain the information needed for this type of study. Once the study is done the process can proceed to the next level within the OSHA standard which is a hearing conservation program.

I would like to interject a small side-step at this point. Rather than rolling straight into the implementation of PPE which is proven to be the lowest reliable factor of protection by the CDC and NIOSH. If any of these noise levels being generated are due to the use of compressed air points of use, EXAIR can potentially lower the noise of these point of use applications. In the events, open blowoffs or “band-aid” fixes are in place to keep processes running, and Engineered Solutions can easily be implemented that will reduce the noise level produced by this operation. Whether it is on the handheld Safety Air Gun in the hands of a CNC operator, or if it is a part/scrap ejector that is blowing the sheet metal press out after every strike, we have products that have proven time over time using an Engineered Solution will save air, reduce noise levels, and still get the job done.

If you would like to discuss OSHA directives revolving around compressed air, share with us a recent citation you received from an inspector for this standard, or just discuss compressed air usage in general, contact us.

Brian Farno
Application Engineer
BrianFarno@EXAIR.com
@EXAIR_BF

 

1 – Equivalent A-Weighted Sound Level Chart – Retrieved from OSHA.Gov – https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=9735&p_table=standards

2 – Permissible Noise Exposures – Retrieved from OSHA.Gov – https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=9735&p_table=standards

 

Protecting Employees With PPE vs. Engineered Controls and Substitution

PPE has been a hot topic and new buzzword for a lot of people and throughout many industries over the past 6 months, and rightfully so. When you look at manufacturing though, PPE has been a buzzword for decades. We continue to evolve processes, equipment, and wearables to ensure the safety of operators.  It all boils down to the fact that PPE and the equipment have to be used, and used appropriately in order to be effective.

When reviewing the CDC’s guides for Hierarchy of Controls the least effective method to protect workers is PPE that they must implement and wear/use properly. The fact is, PPE is one of the cheaper entry levels to get to safe working conditions upfront. However, the cost of ownership can quickly surpass more effective methods of providing safe conditions for operators, such as installation of engineered controls or even substituting the hazard w/ engineered solutions.

CDC’s Hierarchy of Controls

 

So what exactly does that mean to the people on the shop floor? Rather than having to grab a set of pinch and roll earplugs every day on the way through the breezeway to get to the production line, permanently installing quiet products like Super Air Nozzles or Super Air Knives in place of open-ended pipes and drilled pipe blowoffs could eliminate the need for these uncomfortable nuisances. And reliance on personnel to use them correctly, or use them at all is a gamble.

How else can EXAIR help in this pursuit of operator safety and happiness? We offer a free service, the EXAIR Efficiency Lab, which will test your current blow-off products for force, flow, air consumption and noise level. We then recommend an engineered solution if we can improve upon those parameters (spoiler alert, we can) that will meet or exceed OSHA standards for dead-end pressure and allowable noise level exposure.

EXAIR’s Free Efficiency Lab

For this example, installing a quiet product to aid in lowering noise levels can create an environment that no longer needs PPE for protecting personnel. The fix is permanent and eliminates forgotten, lost or broken PPE and the expensive associated with them.

If you would like to discuss any of these options further, please let me know.

Brian Farno
Application Engineer
BrianFarno@EXAIR.com
@EXAIR_BF

 

You Don’t Need to Spend Thousands to Optimize Your Compressed Air System

There is no denying it, saving compressed air is a process.  This process often involves some type of energy audit or at the very least an evaluation of something going wrong with production and a way to improve it.  Many programs, consultants, and sales reps will devise a solution for the problem.

Often times the solution is to create a more efficient supply side of the compressed air system. The supply side is essentially everything within the compressor room or located in close proximity to the actual air compressor. While optimizing the supply side can amount to savings, many of these solutions and services can involve great expense, or capital expenditure processes.  These processes can often lead to delays and continued waste until the solution is in place.  What if there was a way to lower compressed air usage, save energy, solve some demand issues on the compressed air system and save some money while the capital expenditure process goes through for the larger scale project.

These solutions are a simple call, chat, email or even fax away. Our Application Engineers are fully equipped to help determine what points of your compressed air demand side can be optimized. The process generally starts with our Six Steps To Compressed Air Optimization.

6 Steps from Catalog

Once the points of use are evaluated the Application Engineer can give an engineered solution to provide some relief to the strain on your compressed air supply side.  For instance, an open copper pipe blow off that is commonly seen within production environments can easily be replaced with a Super Air Nozzle on the end of a Stay Set Hose that will still bend and hold position like the copper pipe does while also saving compressed air, reducing noise level, and putting some capacity back into the supply side of the compressed air system.

engineered nozzle blow offs
Engineered solutions (like EXAIR Intelligent Compressed Air Products) are the efficient, quiet, and safe choice.

One of the key parts to the solutions that we offer here at EXAIR is they all ship same day on orders received by 3 PM ET that are shipping within the USA. To top that off the cost is generally hundreds, rather than thousands (or tens of thousands) of dollars. Well under any level of a capital expenditure and can generally come in as a maintenance purchase or purchased quickly through the supply cribs.  Then, to take this one step further, when the EXAIR solution shows up within days and gets installed EXAIR offers for you to send in the blow off that was replaced and receive a free report on what level of compressed air savings and performance increases you will be seeing and provide a simple ROI for that blow off (though we would also encourage a comparison before a purchase just so you have additional peace of mind).

This amounts to saving compressed air and understanding how much air is being saved, adding capacity back into your supply side which will reduce strain on the air compressor, give the ability to increase production while the capital expenditure for the end solution of controls and higher efficiency on the supply side is approved to then save even more compressed air and energy.

The point is this, savings and efficiency doesn’t have to involve a capital expenditure, if that is the end game for your project that is great! Let EXAIR provide you a solution that you can have in house by the next business day to save money NOW and then put that savings towards another project. No matter the method, it all starts with a call, chat, email or fax.

Brian Farno
Application Engineer
BrianFarno@EXAIR.com
@EXAIR_BF

 

Putting In The Work: No Matter Where

Last week I was on vacation with my wife’s family.  We had the good fortune of going to Lake Norman, NC and renting a house for everyone to stay in.   While vacation was on a lake and we all had a boat load of fun (mainly because we had a pontoon boat for a week).  Work still needed to get done.   This wasn’t work from the Application Engineering position here at EXAIR.  This work was physically more difficult.

This was training for an event I will be doing hopefully within the next year.  I’ve been attending a Tuesday morning workout for the past six months or so with two other men, who are both Marine veterans and I thank them for their service.  This work we put in on Tuesday morning and a few other random times throughout the week is all for the same events.   The events are put on by a company called GORUCK.  (Yes, just like EXAIR, it is all CAPS all the time, one word.)  These events are classified as endurance events and are lead by either an active or retired Special Forces cadre.  There are different versions but they are all heald to the same standard for participants.  Put in the work, rely on your team, and everyone will get through it together.

At most of the events very few people know each other that well.  This makes forming a team within the few hours you are together very difficult.  That is until you are under a time hack when everyone has their weighted ruck on their back, you have a few hundred extra pounds of sand bags to carry and because it is fun to watch the Cadre gives you a casualty that now has to be buddy carried.  The main focus is to get people of all walks of life, all abilities, all physical aptitudes to come together, build into one another, and make sure everyone is at the end getting a patch to wear on their ruck.

This is why, on every Tuesday I try to put in some hard work mixed in with a lot of stairs.   While I was on vacation and could have easily let that weekly training go, I didn’t.  Instead I got out a deck of cards for the number of reps to each exercise, grabbed a 60 lbs and 40 lb sandbag and went to the tallest section of stairs we had close by, the dock stairs.

While going through the exercises, panting and glistening (for those that don’t know that’s the fancy word for seriously sweating), my youngest daughter came down to “help” me workout.  The look on her face was at first confusion, then after a brief talk and explaining I am trying to better myself by doing this, she switched to full on support.

Burpees have never felt so good until you have a 4 year old cheering you on.  Once I was done with all of my reps and had made over 6 trips up and down the steps with the 60 lb. sandbag I carried my sandbags and followed her in to the house for some well deserved breakfast.

This work could have been easily pushed to the side and not completed.  Instead, I embraced it and did it.  I was going to do the work even if anyone wasn’t watching because I want to better myself so that I may better any team that I am part of.

This same level of dedication is put in to everything we do here at EXAIR.  Customer service, production, assembly, product design, order entry, accounting, and marketing all dedicate to ensure that we fill the needs of our customers because we want to become a strong part of their team.   Whether it means digging deeper on testing a product in order to get some data at different operating pressure, or creating a 100% custom product that we have never manufactured before, we dedicate to the customer and ensure that all possibilities are exhausted so that the customer and EXAIR can both succeed.

If you have any questions about how EXAIR can help your team to reduce compressed air consumption, increase plant efficiency, and save energy through compressed air usage, please contact us.

Brian Farno
Application Engineer
BrianFarno@EXAIR.com
@EXAIR_BF